Home » Blog » P50 Guardrail Fastener System for Afghan-Argentina Railway

P50 Guardrail Fastener System for Afghan-Argentina Railway

In 2021, Anyang Railway Equipment Co., Ltd. Supplied 28,000 sets of P50 guardrail fastener system to the Afghan-Argentina Railway

Rated 4.7/5 based on 388 customer reviews
Share:
Content

The Azerbaijan Railway is the first railway from Aksu to Awati and Alar. It is part of the four vertical and four horizontal lines in the Xinjiang railway network. It is part of a vertical line from Altay to Karamay to Yining to Aksu. Construction started on the month. The project has a total investment of 3.512 billion yuan and a total line length of 114.6 km. It is a single-track, National Railway Class II railway with a design speed of 120 km/h. It passes through Aksu City, Awati County and Alar City. There are 58 extra-large and medium-sized bridges on the whole line. . After the Aksu-Alar railway project is completed, Xinjiang Awati County and Alar City will end the history of no train access, and play an important role in promoting the regional economic development and the improvement of people’s living standards in the counties, cities and industrial parks along the line.

In 2021, Anyang Railway Equipment Co., Ltd. Supplied 28,000 sets of P50 guardrail fastener system to the Afghan-Argentina Railway, each set of guardrail fasteners includes the following products:

Type product Specification Product Unit Quantity
New Type-III Sleeper Rail Fastening System for Guard Rail in Ballasted Bridge Decks screw spike 24*195 TB/T564-92 Pcs 2
nut M24 GB41-86 Pcs 2
flat washer 25*44*4 GB95-85 Pcs 2
double coil spring washer M24 TB565-76 Pcs 2
gusset 7-9# special line 3448-Ⅱ-4 Pcs 1
gusset 11-13# special line 3448-Ⅱ-5 Pcs 1
rubber pad under rail p50/p60 special line 3448-Ⅱ-6 Pcs 1

 

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Conventional Railway