Rail Tension Clips, Rubber Pads Manufacturer for Tianjin Rail Transit Line 4
In 2022, Anyang Railway Equipment Co., Ltd. supplied 85,132 pieces of I-type rail tension clips, ZX-2 type tension clips, II-type tension clips, and I-type inspection pit rail clips to Tianjin Rail Transit Line 4 in 2022. and 225,415 rubber plates.
Tianjin Rail Transit Line 4 is the 7th rail transit line in operation in Tianjin, China. The southern section of Tianjin Rail Transit Line 4 starts from Nankai District Dongnanjiao Station in the north, passes through Nankai District, Heping District, Hexi District, Hedong District, and Dongli District, and ends at Xinxing Village Station in Dongli District in the east.
Till December 2021, the southern section of Tianjin Rail Transit Line 4 is from Dongnanjiao Station to Xinxingcun Station, with a total length of about 19.4 kilometers and a total of 14 stations; the train adopts 6-car B-type trains.
Construction period plan: from January 2020 to December 2024, the construction period is 5 years.
In 2022, Anyang Railway Equipment Co., Ltd. supplied 85,132 pieces of I-type rail tension clips, ZX-2 type tension clips, II-type tension clips, and I-type inspection pit rail clips to Tianjin Rail Transit Line 4 in 2022. and 225,415 rubber plates.