Home » Blog » Type II Rail Fastening Systems Supplier for Guiyang Hub

Type II Rail Fastening Systems Supplier for Guiyang Hub

In 2022, Anyang Railway Equipment Co., Ltd supplied 22,090 sets of 60kg Type II (general area) general-speed rail fastening systems to the Guiyang-Nanning Railway for the Guiyang Hub Project.

Rated 5/5 based on 232 customer reviews
Share:
Content

The newly-built Guiyang-Nanning railway is introduced into the Guiyang hub project, starting from Longli North Station of Guiyang hub in the north, passing through Duyun, Dushan, Libo in Guizhou Province and Huanjiang, Jinchengjiang, Du’an, Mashan, Wuming in Guangxi Zhuang Autonomous Region to Nanning hub Nanning East Railway Station, the new main line has a total length of 481 kilometers (of which the main line of the Guangxi section is 281 kilometers long), the design speed target value is 350 km/h, and the construction period is 6 years. The total investment in Guangxi is 37.64 billion yuan (4.07033 billion yuan for the Nanning hub), which will be constructed by Yungui Railway Guangxi Co., Ltd. (the construction of the Nanning hub is entrusted to Nanning Bureau Group). The preliminary section started on December 29, 2016, and other works in front of the station started on December 20, 2017. The completion date of this project is December 19, 2023.

In 2022, Anyang Railway Equipment Co., Ltd supplied 22,090 sets of 60kg Type II (general area) general-speed rail fastening systems to the Guiyang-Nanning Railway for the Guiyang Hub Project, carried out the standard Q/CR564-2017.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Conventional Railway