Type I Clip Fastener Assembly for 50kg/m and Type II Clip Fastener Assembly for 60kg/m
In 2021, Anyang Railway Equipment Co., Ltd. provided 3080 sets of type I clip fastener assembly for 50kg/m rail and 6098 sets of type II clip fastener assembly for 60kg/m rail for the reconstruction project of the Harbin-Jiamusi Wangsun Uplink Super Bridge.
The Hajia Railway is the longest high-speed railway in the alpine region of my country. It is located in Harbin City and Jiamusi City on the south bank of the Songhua River in the central and eastern Heilongjiang Province. To Jiamusi Station, the main line of the project has a total length of 339.680 kilometers of track laying, with 19 stations along the way, a design speed of 200 kilometers per hour, and a total cost of 34.7 billion yuan. As an important part of the express passenger network of the Northeast Railway, Hajia Railway, together with Haqi, Ha Mu high-speed railway and the Mujia high-speed railway under construction, jointly builds a two-hour economic circle in Heilongjiang Province, radiating 50% of the province’s population and total economic output. The Harbin-Dalian high-speed rail has been continuously integrated into the national high-speed rail network, becoming a fast-track and main road connecting Heilongjiang Province and large and medium-sized cities outside the province. After completion, it has greatly promoted the flow of logistics, people and information.
In 2021, Anyang Railway Equipment Co., Ltd. provided 3080 sets of type I clip fastener assembly for 50kg/m rail and 6098 sets of type II clip fastener assembly for 60kg/m rail for the reconstruction project of the Harbin-Jiamusi Wangsun Uplink Super Bridge.