I-type Track Fastening System, Rail Joint Bars, Gauge Tie Rods for Changsha Xingang Railway
In 2022, Anyang Railway Equipment Co., Ltd. will provide 13,000 sets of I-type track fastening system, 1,300 sets of 50kg/m rail joint bars as well as accessories (with bolts and spring washers) and 375 pcs of gauge tie rods to the Changsha Xingang railway (Phase III).
Changsha Xingang Special Railway Project(Phase III) is EPC general contracting project, locates in Jinxia Economic Development Zone, Kaifu District, Changsha City. The length is about 4.48km, and the length of track laying is about 7.7km.
In 2022, Anyang Railway Equipment Co., Ltd. will provide 13,000 sets of I-type track fastening system, 1,300 sets of 50kg/m rail joint bars as well as accessories (with bolts and spring washers) and 375 pcs of gauge tie rods to the Changsha Xingang railway (Phase III). The composition, assembly performance, technical requirements of rail fastening components, inspection methods, inspection rules, marking and packaging, storage and transportation, laying, maintenance and repair of rail clip fasteners should be strictly in accordance with “Type I Rail Fasteners for Clips” TB/T 1495-1992 Implementation, the technical requirements for gauge tie rods are implemented in accordance with “Ordinary Gauge Rod” TB/T 1780-1986.