Home » Blog » Type I Fastening Systems Manufacturer for Hulin Branch Line

Type I Fastening Systems Manufacturer for Hulin Branch Line

In 2022, Anyang Railway Equipment Co., Ltd supplied 29,832 sets of 50kg I-type fastening systems (used in general areas) to the reconstruction of the railway Hulin branch line

Rated 4.5/5 based on 569 customer reviews
Share:
Content

Reconstruction of the Hulin branch line of the railway — the relocation project of the Huchao-Qingzhen section is located in Huaxi District, Guanshanhu District, Qingzhen City, Guiyang City, Guizhou Province, and Gui’an New District and within the territory of Guizhou Province. The total construction length is 36.509km (33.693km for double-track sections), of which the newly-built main line is 24.542km long; the reconstructed Shanghai-Kunming Railway is 9.366km long; The connecting line of the line from the town to the forest side of the mountain is 0.671km long; the length of the rebuilt Huhao branch line is 0.401km. There are 11 bridges/3934.20m; 61 culverts/1210.45m; 5 frame bridges/1127.14m; 8 cross-line highway bridges/6276.0m; 6256m/8 tunnels.

In 2022, Anyang Railway Equipment Co., Ltd supplied 29,832 sets of 50kg I-type fastening systems (used in general areas) to the reconstruction of the railway Hulin branch line, implementing the TB/T1495-2020 standard; 102,686 sets of 60kg II-type (used in general areas) fastening systems, carried out special line 3351 TB/T3065-2020 standard; 18256 sets of new III bridge 50kg guard rail fastener systems, carried out special line 3448 Q/CR535-2016 standard.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Conventional Railway