In 2026, Anyang Railway Equipment Co., Ltd. supplied 112,125 sets of DTⅢ2-1 fastener metal parts to the Phase I, Section III project of Hangzhou Metro Line 15
In 2025, Anyang Railway Equipment Co., Ltd. supplied 60,000 sets of DTVI2 fastening systems to Phase II of Hangzhou Metro Line 9.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 500 sets of P60 fishplates (including bolts, etc.) and 1000 sets of P50 fishplates (including bolts, etc.) to the Phase I project of Chongqing Rail Transit Line 24.
In 2025, Anyang Railway Equipment Co., Ltd. supplied totally 88,032 sets of Various Rail Fastening Systems to Lanzhou-Zhangye High-speed Railway.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 18400 sets of Fastening Systems to Dapeng branch line of the Shenzhen-Huizhou Intercity Railway.
In 2025, Anyang Railway Equipment Co., Ltd provided 70000 sets TSD1 Type Fastening System to Dalian Metro Line 4.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 16,414 sets of Type I split type double non-vibration damping fastening systems to Nanjing Metro Line S2.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 106,832 sets of Type I elastic rail fasteners and 139,303 sets of Type II Rail Fastening Systems to the Hami East Station capacity expansion and renovation project.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 1,623,006 sets various fastening systems to the Zhundong Jiangjunmiao to Hami Naomuhu (Baishihu South) Railway Second Line Expansion Project.
In 2025, Anyang Railway Equipment Co., Ltd. will provide 30,000 sets of DTVI2 Fastening Systems for Qingdao Metro Line 8.
In 2025, Anyang Railway Equipment Co., Ltd. provided 107,800 sets of Rail Fastening Systems to the Shenshuo Line of the Baoshen Railway for the sleeper replacement project.
The complete set of guardrail fastening system includes rail pads for guardrails, guardrail buckles, screw spikes (with caps), flat washers and double spring washers.
The construction features of the Palembang Light Rail Track Laying Project in Indonesia: Optimizing the trackbed structure and Optimizing the welding rail construction process.
The construction features for Kuala Lumpur MRT Line 2, Malaysia
Innovative transition construction of special vibration reduction sections of the connecting channel for Hangzhou Metro Line 10
The construction features for Harbin Metro Line 3.
The process from short track to long track and then complete subeway line.
The process how to put the installed track into the subway tunnel
In 2024, Anyang Railway Equipment Co., Ltd. provided Type I Fastening system and Type II fastening system to the Beijing Line 13 switch sleeper renovation project.
In 2024, Anyang Railway Equipment Co., Ltd. provided insulated gauge rods, guardrail fastening systems, glued insulating joint bars, rail joints, single coil spring washers, and joint bolts to Chengdu-Chongqing Railway.
In 2024, Anyang Railway Equipment Co., Ltd. provided 54,564 pcs of Type I T-bolts, 54,564 pcs of Type I gauge baffles, 54,564 pcs of Type I cap nuts and 54,564 pcs of Type I elastic rail clips to China Railway Wuhan Bureau Group Co., Ltd.
In 2024, Anyang Railway Equipment Co., Ltd(AT). provided 10,888 sets of Type I fastening systems for 50kg/m rail to the special line reconstruction and expansion project of Hulunbuir Northeast Fufeng Biotechnology Co., Ltd. (Harbin Railway)
In 2024, Anyang Railway Equipment Co., Ltd(AT)provided rail clamps, rubber pad, clamp seat for the small-resistance fastening systems to Hohhot Railway Bureau Hohhot Public Works Section.
In 2024, Anyang Railway Equipment Co., Ltd. provided 60,000 sets of Type III split fastening systems to the Xi’an Metro Line 15 track laying project.
At present, there are mainly two types of urban rail transit track beds: integral track bed and gravel track bed. T
In 2022, Anyang Railway Equipment will supply 280,171 pieces of Type II rail elastic clips to China Railway Kunming Bureau Group Co., Ltd.
From 2022 to 2023, Anyang Railway Equipment Co., Ltd(AT). will supply 120,000 sets of type III railway fastening systems for Zhengzhou Metro 8, each set of fastening system includes type III rail elastic clips, pre-embedded iron seats, insulating insulators, and rubber plates.
In 2022, Anyang Railway Equipment Co., Ltd. supplied DZIII and CZI fastener systems to the first phase project of Chengdu Rail Transit Line 30.
In 2022, Anyang Railway Equipment Co., Ltd supplied 29,832 sets of 50kg I-type fastening systems (used in general areas) to the reconstruction of the railway Hulin branch line