Home » Blog » Type III Split Fastening Systems Supplier for Xi’an Metro Line 15

Type III Split Fastening Systems Supplier for Xi’an Metro Line 15

In 2024, Anyang Railway Equipment Co., Ltd. provided 60,000 sets of Type III split fastening systems to the Xi’an Metro Line 15 track laying project.

Rated 4.5/5 based on 417 customer reviews
Share:
Content

The main line of Xi’an Metro Line 15 runs from Binhe New Area in Huyi District to the core area of Aerospace City Phase II. It runs east-west with a total length of 46.5km and a total of 25 stations. The branch line runs from Taipingyu Caotang Temple Scenic Area to Xiliu Village. 14. 1km, with 5 stations. A new section and two sections will be built on the entire line, sharing the Changming Road control center of Line 8 and 3 main transformers. It adopts a group of 6 A-type cars and has a maximum operating speed of 100km/h.

Among them, the first phase of Line 15 is an east-west backbone line in the southern part of the main urban area. The line is laid along the planned Weidou Road ~ Guodu West Street ~ Guodu East Street ~ West Chang’an Street ~ East Chang’an Street, which are all east-west traffic arteries in the southern part of the main city, connecting the New Hi-tech Zone, Guodu Town, Chang’an University Town and Aerospace in sequence Industry Base. The first phase of the project from Xiliu to Hanjiawan (CK30+000.000~CK49+466.221) has a total length of 19.46km, all of which are laid underground, with a total of 13 stations (including 7 transfer stations, and 2, 4, 6 and 7 stations). , transfer to Lines 12, 16 and 20), there is a depot, located south of Xiliu Station, in the current Jiangren Village, there are two main substations, which share the Feitian main transformer with Line 4, and are newly built Xiliu main transformer is located in Xiliu depot. The lines are mainly laid along the planned Wei Dou Road, Guo Du West Street, Guo Du East Street, West Chang’an Street and East Chang’an Street.

This project is all main line track engineering construction, mainly including track engineering from Xiliu Station (inclusive) to Guodu Station (exclusive), Aerospace City Station (exclusive) to Hanjiawan Station (inclusive), and evacuation within the main line. Platform installation, including: 15 sets of single-turn switches, 2 sets of 5-meter crossings, with a total length of 25.76km.

In 2024, Anyang Railway Equipment Co., Ltd. provided 60,000 sets of Type III split fastening systems to the Xi’an Metro Line 15 track laying project.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Blog