Home » Blog » 88,032 Sets of Various Rail Fastening Systems Supplier for Lanzhou-Zhangye High-speed Railway

88,032 Sets of Various Rail Fastening Systems Supplier for Lanzhou-Zhangye High-speed Railway

In 2025, Anyang Railway Equipment Co., Ltd. supplied totally 88,032 sets of Various Rail Fastening Systems to Lanzhou-Zhangye High-speed Railway.

Rated 5/5 based on 265 customer reviews
Share:
Content

The Lanzhou-Zhangye High-speed Railway, also known as the Lanzhou-Zhangye Third and Fourth Line Railway or the Lanzhou-Zhangye Passenger Dedicated Line, is a high-speed railway in China connecting Lanzhou and Zhangye in Gansu Province. It is an important regional high-speed railway connection line in the “Medium and Long-Term Railway Network Plan” (2016 revised edition).

Construction of the Lanzhou West to Zhongchuan Airport section began on December 21, 2012; it opened to traffic on September 30, 2015. Construction began on the Zhongchuan Airport to Wuwei East section on June 30, 2019; it opened to traffic on June 29, 2024. Construction began on the Wuwei East to Zhangye West section on December 16, 2024. The newly built railway runs from Wuwei East Station to Zhangye West Station, with a main line length of approximately 244 kilometers and a designed speed of 250 kilometers per hour. The Lanzhou-Zhangye High-Speed ​​Railway runs from Lanzhou West Station to Zhangye West Station, with a total length of approximately 518 kilometers and 17 stations. Its designed speed is 160-250 kilometers per hour.

In 2025, Anyang Railway Equipment Co., Ltd. supplied 20,592 sets of Type I elastic rail fasteners (TB/T1495-2020), 66,349 sets of Type II elastic Rail Fastening Systems(TB/T3065-2020), 670 sets of 50kg Guard Rail Fastening Systems for the new Type II bridge (dedicated line 3448), and 421 sets of Low-Resistance Fastening Systems for both passenger and freight lines (Yanxian 2013Q/CR671-2018), totaling 88,032 sets of Rail Fastening Systems.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Blog