In 2025, Anyang Railway Equipment Co., Ltd. supplied 500 sets of P60 fishplates (including bolts, etc.) and 1000 sets of P50 fishplates (including bolts, etc.) to the Phase I project of Chongqing Rail Transit Line 24.
In 2025, Anyang Railway Equipment Co., Ltd. provided 14,000 sets of SYDC-2 fastening systems for the newly built tram project from Jinan to Jiyang District, China.
In 2025, Anyang Railway Equipment Co., Ltd. supplied totally 88,032 sets of Various Rail Fastening Systems to Lanzhou-Zhangye High-speed Railway.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 18400 sets of Fastening Systems to Dapeng branch line of the Shenzhen-Huizhou Intercity Railway.
In 2025, Anyang Railway Equipment Co., Ltd provided 70000 sets TSD1 Type Fastening System to Dalian Metro Line 4.
In 2025, Anyang Railway Equipment Co., Ltd. provided 1,995,247 sets of rail fastening systems for the expansion and renovation project of the Linhe-Ejina section of the Linhe-Hami Railway.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 59,000 sets of DTIII2-1 type fastening systems to the Phase I project of Shenyang Metro Line 6.
In 2025, Anyang Railway Equipment Co., Ltd. supplied Urumqi Metro Line 2 with 16,357 sets of Type I elastic rail clip dowel-type fastening system, 17,272 sets of Type I elastic clip split type fastening systems and 3,987 sets of Type II elastic rail clip dowel-type elastic rail clips.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 1,623,006 sets various fastening systems to the Zhundong Jiangjunmiao to Hami Naomuhu (Baishihu South) Railway Second Line Expansion Project.
In 2025, Anyang Railway Equipment Co., Ltd. Provided the Chengdu Railway Station renovation project with 7,200 sets of 50kg/m Type I rail clip fastening systems and 164,000 sets of 60kg/m Type II rail clip fastening systems.
The complete set of guardrail fastening system includes rail pads for guardrails, guardrail buckles, screw spikes (with caps), flat washers and double spring washers.
Prefabricated track construction technology are carried out by 5 steps.
The project optimizes the traditional handheld water pipe watering maintenance to an automatic maintenance trolley, which is easy to operate, maintains uniformly, and saves water. It has also obtained a utility model patent and has been promoted in the Chengdu rail transit market.
The Qingdao Metro Line 13 project first adopted the “steel cage track laying method” construction process in the underground section to lay the steel spring floating plate ballast.
The construction features for Kuala Lumpur MRT Line 2, Malaysia
Innovative rail welding technology and ballast bed construction technology, Innovative rail welding technology and ballast bed construction technology
Innovative transition construction of special vibration reduction sections of the connecting channel for Hangzhou Metro Line 10
The laying of subway tracks is a complex task, and the main processes involve track assembly and hoisting, centerline layout, track rough adjustment, track fine adjustment and other links.
In 2024, Anyang Railway Equipment Co., Ltd. provided 6,700 sets of new Type III bridge sleepers P50 guardrail fastening systems to the Hanzhong Maintenance Section of Xi’an Bureau Group Corporation.
In 2024, Anyang Railway Equipment Co., Ltd. provided 1,045 sets of Type I fastening systems for 50kg/m rails and 4,223 sets of Type II fastening systems for 60kg/m rails to the existing railway reconstruction project of the Suihua Station to departure line extension project.
In 2024, Anyang Railway Equipment Co., Ltd.provided a total of 7,703 sets of Type II rail fastening systems to the rail extension projects of Shuanglongshan Station and Huixintian Station on the Fuqian Front Line
In 2024, Anyang Railway Equipment Co., Ltd. provided 54,564 pcs of Type I T-bolts, 54,564 pcs of Type I gauge baffles, 54,564 pcs of Type I cap nuts and 54,564 pcs of Type I elastic rail clips to China Railway Wuhan Bureau Group Co., Ltd.
In 2024, Anyang Railway Equipment Co., Ltd(AT). provided 10,888 sets of Type I fastening systems for 50kg/m rail to the special line reconstruction and expansion project of Hulunbuir Northeast Fufeng Biotechnology Co., Ltd. (Harbin Railway)
In 2024, Anyang Railway Equipment Co., Ltd(AT)provided rail clamps, rubber pad, clamp seat for the small-resistance fastening systems to Hohhot Railway Bureau Hohhot Public Works Section.
The video shows how concrete sleepers are made and laying in the railway construction.
BIM technology is used for simulation applications to assist decision-making and improve the ability to manage and control the entire process of engineering construction, thereby improving the quality of engineering construction.
The BIM application of the Beijing-Xiongxiong Intercity Railway has pushed the application of BIM technology in the railway industry to a new height and depth in many aspects. It is a milestone event in the history of the development of railway BIM technology.
The CJ-2 fastening system is elastic, direct. It has been designed to replace the RN elastic fastening that has been used since the RS type concrete sleeper began to be used, in RENFE, and to improve the P-2 fastening currently used, whose conception is the same.
In 2022, Anyang Railway Equipment will supply 280,171 pieces of Type II rail elastic clips to China Railway Kunming Bureau Group Co., Ltd.