1,995,247 Sets of Rail Fastening Systems Supplier for Linhe-Hami Railway
In 2025, Anyang Railway Equipment Co., Ltd. provided 1,995,247 sets of rail fastening systems for the expansion and renovation project of the Linhe-Ejina section of the Linhe-Hami Railway.
The Linhe-Harbin Railway renovation project covers a total length of 685.157 km, spanning western Inner Mongolia Autonomous Region. The Tianze Line, as a crucial component, holds strategic significance. Located in Ejin Banner, Alxa League, Inner Mongolia Autonomous Region, the Tianze Line connects the Swan Lake West Station of the Linhe-Harbin Railway to the Ceke Port Station, with a total length of 68.818 km. This line plays a vital role in strengthening Ejin Banner’s connections with the outside world, particularly in promoting trade prosperity at the Ceke Port.
In 2025, Anyang Railway Equipment Co., Ltd. provided 1,995,247 sets of rail fastening systems for the expansion and renovation project of the Linhe-Ejina section of the Linhe-Hami Railway. The project included 4,416 sets of Type I rail fastening systems (50kg/m rail, TB/T1495-2020), 19,375,825 sets of Type II rail fastening systems (60kg/m rail, dedicated line 3551, TB/T3065-2020), and 53,249 sets of Type II rail fastening systems (75kg/m rail, dedicated line 3551, TB/T3065-2020).