Home » Blog » DJK5 Track Fastening Systems, Type I Rail Fastener System for Zhengzhou-Gongyi Municipal Railway

DJK5 Track Fastening Systems, Type I Rail Fastener System for Zhengzhou-Gongyi Municipal Railway

In 2021, Anyang Railway Equipment Co., Ltd. provided the project with 13,746 sets of DJK5-4 track fastening systems, 7,980 sets of DJK5-1 type track fastener systems, 7,980 sets of DJK5-1 track fastening systems, and 132 sets of Type-I clip separated rail fastening systems, 20242 sets of elastic Type-I railway fastening system to the Zhengzhou-Gongyi Municipal Railway.

Rated 4.5/5 based on 326 customer reviews
Share:
Content

The Zhengzhou-Gongyi Municipal Railway Municipal Supporting Engineering Depot Project is located in the plot between the east of the planned Ring Road, the south of Zhengshang Road, the west of the planned Ring Expressway auxiliary road, and the north of Zhongyuan West Road. The total length of the plot is about 1660m, the total width is about 420m, and the total area is about 28.23 hectares. The Hongshipo Vehicle Base consists of a vehicle depot, a comprehensive maintenance center, and a general material warehouse, with a total construction area of about 120,000m2, of which the joint maintenance warehouse has a reserved area of 7,400m2. The project duration is 868 days and the project cost is 880 million YUAN.

In 2021, Anyang Railway Equipment Co., Ltd. provided the project with 13,746 sets of DJK5-4 track fastening systems, 7,980 sets of DJK5-1 type track fastener systems, 7,980 sets of DJK5-1 track fastening systems, and 132 sets of Type-I clip separated rail fastening system, 20242 sets of elastic Type-I railway fastening system to the Zhengzhou-Gongyi Municipal Railway.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit