50kg/m, 60kg/m Rail Joint Splints for Suzhou Rail Transit S1 Line
Anyang Railway Equipment Co., Ltd. provided 60kg/m rail joint splint and 50kg/m rail joint splints to Suzhou Rail Transit S1 line in 2021.
Suzhou Rail Transit Line S1 is a subway line under construction in Suzhou, the first urban rail transit line in Suzhou, and the first rail transit in the Suzhou rail transit network to connect with the Shanghai rail transit network. The line is the first rail transit line in Suzhou that applies BIM construction technology throughout the entire process and adopts centralized video storage in the cloud. It is the first urban rail transit line in China to apply fully automated driving technology. It is expected to open for initial operation in December 2023.
Suzhou Rail Transit Line S1, with a total length of 41.27 kilometers; a total of 28 stations, all of which are underground stations; the Suzhou Rail Transit Line S1 after completion, not only the east-west public transportation corridor in Kunshan City, but also Suzhou and Shanghai. At the same time, it will improve the 60-minute economic circle of Suzhou Rail Transit S1 Line, and effectively promote the strategic process of regional integration in the Yangtze River Delta.
Anyang Railway Equipment Co., Ltd. provided 60kg/m rail jont splints and 50kg/m rail joint splints to Suzhou Rail Transit S1 line in 2021. The railway joint splint bar follows the relevant standards of TB/T2345-93 “Technical Specifications for the Procurement of 43kg/m~75kg/m as Joint Bar”. Fishbolts were made in accordance with the relevant standards of TB/T2347-93 “High-strength rail joint bolts and nuts”.