Home » Blog » P60 Frozen Joint Bars Manufacturer for Zhengzhou Metro Line 12

P60 Frozen Joint Bars Manufacturer for Zhengzhou Metro Line 12

In 2022, Anyang Railway Equipment Co., Ltd. provided 572 sets of P60 frozen joint bars for Zhengzhou Metro Line 12.

Rated 4.5/5 based on 520 customer reviews
Share:
Content

Zhengzhou Metro Line 12 is a subway line under construction in Zhengzhou, Henan Province, China. It will be started in March 2020 and is expected to be put into operation in December 2023.

The first phase of Zhengzhou Metro Line 12 starts from Shengfosi Station in Guancheng Hui District and ends at Longzihu East Station in Zhengdong New Area, connecting important areas such as Zhengzhou Economic and Technological Development Zone, CBD in Zhengdong New Area, and Longzihu University Park. The line is mainly laid along Jingkai Third Street – Huanghe South Road – Ping’an Avenue, with an “inverted L” trend.

As of August 2022, Zhengzhou Metro Line 12 Phase I Project has a total length of about 17.03km, all of which are underground lines. There are 11 stations, all of which are underground stations, and one depot, which is Hexi depot. The train has GoA4 level driverless technology, the maximum design speed is 100km/h, and 6-car formation B-type train is adopted.

In 2022, Anyang Railway Equipment Co., Ltd. provided 572 sets of P60 frozen joint bars for Zhengzhou Metro Line 12.

 

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit