P50 Rail Joint Assemblies, Bridge Deck Guard Rail Accessories for Chang-Gan High-Speed Railway Bridge
In 2019, Anyang Railway Equipment Co., Ltd. provided 2,900 sets of P50 rail joint assemblies and 29,600 sets of P50 bridge deck guard rail accessories to Chang-Gan High-speed Railway Bridge.
Chang-Gan High-speed Railway, also known as Changji-Ganzhou Passenger Dedicated Line, is a high-speed railway connecting Nanchang City and Ganzhou City in Jiangxi Province, an important part of the “Beijing-Hong Kong (Taiwan) Channel”, one of the “eight vertical and eight horizontal” high-speed railway main channels.
On December 20, 2014, the construction of the Chang-Gan high-speed railway started; on July 15, 2015, the construction of the entire Chang-Gan high-speed railway started; On December 26, 2019, the Chang-Gan high-speed railway opened for operation. The length of main line of Changjiang-Ganzhou high-speed railway is 416 km, with 12 passenger stations and a design speed of 350 km/h.
In 2019, Anyang Railway Equipment Co., Ltd. provided 2,900 sets of P50 rail joint assemblies (each set of rail joint assembly includes 2 rail joint bar, 6 high-strength joint bolts and nuts, and 6 single coil spring washers) and 29,600 sets of P50 bridge deck guard rail accessories (each set of guard rail accessories includes 4 screw spikes, 4 double-coil spring washers, 2 rubber plates, 4 flat washers, new type III guard rail intermediate gusset and joint gusset) to Chang-Gan High-speed Railway Bridge.