Regular Joint Bars, Freezing Joint Bars, Joggled /Bulge Rail Joint Bars for Chengdu Subway Line 9
In 2018, Anyang Railway Equipment Co., Ltd provided regular joint bars(for 50kg/m steel rails and 60kg/m steel rails), freezing joint bars(for 50kg/m steel rails), Joggled /Bulge rail joint bar(for 60kg/m steel rails), first aid device for broken steel rails for Chengdu Subway Line 9.
Chengdu Metro refers to the urban rail transit serving Chengdu, Sichuan Province, China. Its first line, Chengdu Metro Line 1, was officially opened on September 27, 2010, making Chengdu the 12th city in Mainland China with rail transit.
In June 2021, Chengdu Metro opened a total of 12 lines with a total length of 518.96 km, all of which adopted the subway system. A total of 373 stations were put into operation with 46 transfer stations. At the same time, Chengdu has become the 1st city in China to open five new subway lines at one time, and it is also the city with the fastest subway operating mileage in the country to exceed 500 km, and officially ranks among the “4th city” of domestic rail transit.
Chengdu Metro Line 9 is the ninth subway line in Chengdu, Sichuan Province, China. The first phase of construction started on December 31, 2016, and the first phase was opened on December 18, 2020. Chengdu Metro Line 9 is the first fully automatic and driverless subway line in Chengdu, and the first fully automatic and driverless subway line in central and western China.
In 2018, Anyang Railway Equipment Co., Ltd provided regular joint bars(for 50kg/m steel rails and 60kg/m steel rails), freezing joint bars(for 50kg/m steel rails), Joggled /Bulge rail joint bar(for 60kg/m steel rails), first-aid device for broken steel rails for Chengdu Subway Line 9. As of December 2020, the total length of the first phase of Chengdu Metro Line 9 is 22.18 km, all of which are underground lines.