Type III Railway Fastening Systems for Zhengzhou Metro Line 8

In 2022, Anyang Railway Equipment Co., Ltd. supplied 150,000 sets of Type III railway fastening systems for P60 steel rails to Zhengzhou Metro Line 8 Phase I Project.

Rated 5/5 based on 504 customer reviews
Share:
Content

Zhengzhou Metro Line 8, a subway line under construction in Zhengzhou, Henan Province, is positioned as the backbone of urban rail transit. Planned commencement date: July 15, 2022. Planned completion date: December 31, 2024.

The main line and wiring of Zhengzhou Metro Line 8 Phase I Project are laid with 57.89km tracks and 28 sets of turnouts; 17.4km of depot track, 51 sets of turnouts.

In 2022, Anyang Railway Equipment Co., Ltd. supplied 150,000 sets of Type III railway fastening systems for P60 steel rails to Zhengzhou Metro Line 8 Phase I Project.