Home » Blog » Cast-iron Tie plates and Gauge -Adjusting Gussets for Railway Rail Fastening System for Rail Transit Line 3

Cast-iron Tie plates and Gauge -Adjusting Gussets for Railway Rail Fastening System for Rail Transit Line 3

Anyang Railway Equipment Co., Ltd. supplied cast-iron tie plates and distance-adjusting clamps for railway rail fastening systems to Changsha Rail Transit Line 3, all of which are made of QT450-10.

Rated 4.9/5 based on 450 customer reviews
Share:
Content

Changsha, also known as Star City, is a prefecture-level city, the provincial capital, megacity under the jurisdiction of Hunan Province, and an important central city in the middle reaches of the Yangtze River approved by the State Council. Changsha Metro Line 3 is the 4th line of Changsha Rail Transit (opened simultaneously with Line 5). Construction started on January 3, 2019, trial operation began on December 30, 2019, and trial operation began on June 28, 2020.

Anyang Railway Equipment Co., Ltd. supplied cast-iron tie plates and distance-adjusting clamps for railway rail fastening systems to Changsha Rail Transit Line 3, all of which are made of QT450-10. The total length of the first phase of Changsha Rail Transit Line 3 is 36.5 km, all of which are underground lines. There are 25 stations in total, with an average station spacing of 1.491 km.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit