50kg/m and 60kg/m Rail Type II Fastening System for Changsha-Zhuzhou-Tanzhou Intercity Railway
In 2019, Anyang Railway Equipment Co., Ltd. provided 27,409 sets of type II ordinary fastening system for 60kg/m railway rail and 8,714 sets of type I ordinary fastening system for 50kg/m railway rail to the Changshi connecting line of Changsha-Zhuzhou-Tanzhou Intercity Railway.
The Changshi connecting line of Changsha-Zhuzhou-Tanzhou Intercity Railway starts from Changsha West Station and crosses Changsha-Changzhou Expressway into Wushan Station of Shi-Changzhou Railway. The length of the line is 9 km.
On October 12, 2018, the feldspar contact line started construction. In October 2019, the Wushan Tunnel of the feldspar tie line was completed. In November 2019, the feldspar tie line began to lay the track. Open to traffic on January 10, 2020.
In 2019, Anyang Railway Equipment Co., Ltd. provided 27,409 sets of type II ordinary fastening system for 60kg/m railway rail (used in general areas, according to the Q/CR5364-2017 standard) and 8,714 sets of type I ordinary fastening system for 50kg/m railway rail to the Changshi connecting line of Changsha-Zhuzhou-Tanzhou Intercity Railway (used in general areas, according to Q/CR5363-2017 standard), 1316 sets of Shilong small resistance railway rail fastening system (according to the design drawing of 9204 research line).