Home » Blog » 50kg and 60kg rail fishplates(joint bars) for Chongqing Rail Transit Line 5

50kg and 60kg rail fishplates(joint bars) for Chongqing Rail Transit Line 5

In 2019, Anyang Railway Equipment Co., Ltd(AT) provided 50kg/m and 60kg/m rail fishplates to Chongqing Rail Transit Line 5.

Rated 4.7/5 based on 588 customer reviews
Share:
Content

Chongqing Rail Transit Line 5 is the north-south backbone line of Chongqing Rail Transit, and the world’s first subway line that can realize the interconnection of urban rail transit. As of January 2021, the operating mileage of Chongqing Rail Transit Line 5 is 35.02 km, with a total of 22 stations, including 18 underground stations and 4 elevated stations;

In 2019, Anyang Railway Equipment Co., Ltd(AT) provided 50kg/m and 60kg/m rail fishplates to Chongqing Rail Transit Line 5. The railway fishplates were made in accordance with the relevant standards of TB/T2345-08 “Technical Specifications for the Procurement of 43kg/m~75kg/m as Joint Bar”.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit