Home » Blog » Type III Railway Fastening Systems Manufacturer for Zhengzhou Metro Line 6

Type III Railway Fastening Systems Manufacturer for Zhengzhou Metro Line 6

In 2022, Anyang Railway Equipment Co., Ltd. supplied 74320 sets of Type III railway fastening systems for P60 steel rails to Zhengzhou Metro Line 6 Phase I Project.

Rated 4.5/5 based on 263 customer reviews
Share:
Content

Zhengzhou Metro Line 6 is a subway line under construction in Zhengzhou City, Henan Province, and its function is positioned as the backbone of urban rail transit.

The first phase of Zhengzhou Metro Line 6 has a total length of 43.4 km and 28 stations. The line uses a group of 6 A-type vehicles with a maximum running speed of 80km/h.

Zhengzhou Metro Line 6, a subway Line under construction in Zhengzhou, Henan Province, is positioned as the backbone of urban rail transit. Planned commencement date: August 1, 2022. Planned completion date: September 30, 2024.

The track laying length of Zhengzhou Metro Line 6 Phase I Project is 50.857km, the length of the line is 2.876km, and the total length is 53.733kmh.

In 2022, Anyang Railway Equipment Co., Ltd. supplied 74320 sets of Type III railway fastening systems for P60 steel rails to Zhengzhou Metro Line 6 Phase I Project.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit