Home » Blog » Rail Joint Bars(Railway Fishplates) for P50 and P60 Steel Rails

Rail Joint Bars(Railway Fishplates) for P50 and P60 Steel Rails

In 2020, Anyang Railway Equipment Co., Ltd. provided regular rail joint bars(railway fishplates) for P50 and P60 steel rails to Foshan Metro Line 3.

Rated 4.5/5 based on 357 customer reviews
Share:
Content

Foshan Metro Line 3 is a line under construction in Foshan Metro. It belongs to urban rail transit. It is positioned as a backbone express line in the north-south direction of Foshan.

As of the beginning of October 2020, most of the sites have started civil construction, and the shield is advancing in an orderly manner. Foshan Metro Line 3 is expected to be put into trial operation by the end of 2022 and will be operational in June 2023.

In 2020, Anyang Railway Equipment Co., Ltd. provided regular rail joint bars(railway fishplates) for P50 and P60 steel rails to Foshan Metro Line 3. The railway fishplates were made in accordance with the relevant standards of TB/T2345-08 “Technical Specifications for the Procurement of 43kg/m~75kg/m as Joint Bar”.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit