Home » Blog » DZIII-3, I, II, , CA-1 Fastening Systems Manufacturer for Chengdu Rail Transit Line 13

DZIII-3, I, II, , CA-1 Fastening Systems Manufacturer for Chengdu Rail Transit Line 13

In 2022, Anyang Railway Equipment Co., Ltd. provided 151,364 sets of DZⅢ-type fastening systems (for 60kg/m rail) and 24,785 sets of DZⅢ-3  fastening systems (for 60kg/m rails), 20291 sets of I-type railway fastening systems(for 50kg/m rail), 4271 sets of II-type railway fastening systems (for 60kg/m rail), 1691 sets of CZ-1 fastening systems (for 50kg/m rail) rail).

Rated 4.7/5 based on 273 customer reviews
Share:
Content

Chengdu Metro refers to the urban rail transit serving Chengdu, Sichuan Province, China. Its first line, Chengdu Metro Line 1, was officially opened on September 27, 2010, making Chengdu the 12th city in Mainland China with rail transit.

In June 2021, Chengdu Metro opened a total of 12 lines with a total length of 518.96 km, all of which adopted the subway system. A total of 373 stations were put into operation with 46 transfer stations. At the same time, Chengdu has become the 1st city in China to open five new subway lines at one time, and it is also the city with the fastest subway operating mileage in the country to exceed 500 km, and officially ranks among the “4th city” of domestic rail transit.

The first phase of Chengdu Rail Transit Line 13 has a total length of 29.06km, all of which are underground lines. It mainly passes through Qingyang District, Wuhou District, Jinjiang District, and Longquanyi District. There are 21 stations in total, including 14 transfer stations and Longquan. 1 depot, which is co-located with Line 5 and Line 9. There are 2 main substations on the whole line, namely Peifeng main substation (located in Wuqing depot) and Longquan main substation (located in Longquan depot). The center is located in the second phase of the Xinmiao Control Center, and the backup center is located in the Longquan Depot.

In 2022, Anyang Railway Equipment Co., Ltd. provided 151,364 sets of DZⅢ-type fastening systems (for 60kg/m rail) and 24,785 sets of DZⅢ-3  fastening systems (for 60kg/m rails), 20291 sets of I-type railway fastening systems(for 50kg/m rail), 4271 sets of II-type railway fastening systems (for 60kg/m rail), 1691 sets of CZ-1 fastening systems (for 50kg/m rail) rail).

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit