Insulated Buffer Pads Manufacturer for Tuodian Railway Transportation Company
In 2024, Anyang Railway Equipment Co., Ltd. provided 20,000 pieces of P50 rail insulated buffer pads to China Railway First Bureau Group Xinyun Engineering Co., Ltd. Tuodian Railway Transportation Company.
China Railway First Bureau Xinyun Electric Power Consignment Railway Transportation Company is mainly responsible for the general contracting operation and management of the 42.567 km of the dedicated railway line of the Inner Mongolia Datang Tuoketuo Power Plant, the 14.2 km of the Huzhun Railway’s power consignment branch line, and the 58.433 km of combined transportation tasks of the Dazhun Railway. At the same time, it is responsible for the maintenance tasks of the dedicated power line, the Huzhun Railway power line, Hengnuo Logistics and the gas company line.
Tuoketuo Power Plant, one of the northern corridors of the West-East Electricity Transmission, is responsible for the direct transmission of electricity to Beijing. The coal used for power generation is transported by the special line of Tuoketuo Electricity Transportation Company. At present, the special lines of the Todian Railway Transport Company include 42.567 km of self-managed and 58.433 km of combined transportation lines of the Dazhun Line (Datong Zhungeer). This special line for coal transportation starts from the Dazhun Line Point Daigou Station in the east and passes through Longwang Canal, Yaogou, Erdaohe, Wangyuying and other stations arrive at the coal unloading yard of the power plant. In order to adapt to the capacity of the main trunk lines and the development requirements of the transportation organization model, and to minimize the impact on the trunk line transport capacity due to different train transportation organization models, the railway Dedicated lines should adopt a transportation organization plan that matches that of mainline railways. Combined with the actual situation of the Torch and Electric Railway Transport Company, how to choose a plan for operating a 10,000-ton combined heavy-haul train to achieve coordinated transportation of main and branch lines and improve the comprehensive efficiency of transportation has become a practical issue that must be studied by the Torch and Electric Railway.
In 2024, Anyang Railway Equipment Co., Ltd. provided 20,000 pieces of P50 rail insulated buffer pads (length: 185mm, width:131mm, thickness: 16mm) to China Railway First Bureau Group Xinyun Engineering Co., Ltd. Tuodian Railway Transportation Company.