Emergency Clamps, Insulated Gauge Rods for Lunan High-Speed Railway
In 2022, Anyang Railway Equipment Co., Ltd. has been providing emergency clamps for P60 rail, P50 rail joints, P60 rail joints, insulated gauge rods and other railway accessories to Lunan high-speed railway.
The Lunan high-speed railway, with a total length of 494 km and a design speed of 350 km/h, is an important part of the “three horizontal and five vertical” high-speed railway network in Shandong Province. The most populous railway project along the line.
The ballastless track of the Helan section of the South Shandong high-speed railway has a total length of 87.36 km. After the opening of the Heze-Lankao section of the South Shandong high-speed railway, it can effectively solve the problem of rapid travel of the masses in southwest Shandong, and promote the transformation of new and old kinetic energy in Shandong Province and the sustainable and healthy development of the economy and society along the line. significant.
In 2022, Anyang Railway Equipment Co., Ltd. has been providing emergency clamps for P60 rail, P50 rail joints, P60 rail joints, insulated gauge rods and other railway accessories.