Home » Blog » P50-P60 Rail Joint Bars Manufacturer for Guangzhou Metro Line 12

P50-P60 Rail Joint Bars Manufacturer for Guangzhou Metro Line 12

In 2022, Anyang Railway Equipment Co., Ltd. provided 620 sets of joint bars for 60kg/m railway rails and 895 sets of joint bars for 50kg/m railway rails to Guangzhou Metro Line 12.

Rated 4.9/5 based on 434 customer reviews
Share:
Content

Guangzhou Metro Line 12 is the structural backbone line from northwest to southeast of the “X” diagonal in the framework of Guangzhou urban rail transit network, and will be the first driverless subway line in Guangzhou. On November 19, 2018, the construction of Guangzhou Metro Line 12 was started, and it is expected to be put into trial operation at the end of 2023, with its logo color of tea green.

The total construction length of the Guangzhou Metro Line 12 track project is 85.25km, including 74.96km of main line, 2.42km of auxiliary line, 1.14km of connecting line and 4.22km of entrance and exit section line. There are two vehicle bases, Chatou parking lot is 16.81km, and the parking lot in the south of University Town is 10.27km. Main quantities: 49.01km general and medium damping track bed for main line, 4.22km general monolithic track bed for entrance and exit section, 14.65km high damping monolithic track bed, 11.30km steel spring floating slab track bed, 45 sets of single turnout, and 7 sets of crossover; Chatou depot has 16.81km of track laying, 43 sets of single turnout and 1 set of crossover; 10.27km track laying in the parking lot in the south of the University Town, 26 sets of single turnout, 1 set of crossover and related line ancillary facilities.

In 2022, Anyang Railway Equipment Co., Ltd.  provided 620 sets of joint bars for 60kg/m railway rails and 895 sets of joint bars for 50kg/m railway rails to Guangzhou Metro Line 12.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit