Home » Blog » Insulated Fishplates and Standard Fishplates Manufacturer for Wuhan Metro

Insulated Fishplates and Standard Fishplates Manufacturer for Wuhan Metro

In 2025, Anyang Railway Equipment Co., Ltd. supplied Insulated Fishplates and standard Fishplates to the Wuhan Rail Transit Line 12.

Rated 4.8/5 based on 490 customer reviews
Share:
Next:
This is already the latest article
Content

Wuhan Metro Line 12 is a metro line under construction in Wuhan, Hubei Province, China, and is the city’s first metro loop line.

Civil construction and pre-embedded tracks began at Yuanlin Road Station on December 18, 2017; construction of the Wuchang section began on March 30, 2020. The first section is expected to open in 2026, with the entire line operational in 2027.

Wuhan Metro Line 12 is approximately 59.9 km long and is entirely underground. It has 37 stations, all of which are underground, with an average station spacing of approximately 1,618 meters. It utilizes 6-car A-type trainsets.

In 2025, Anyang Railway Equipment Co., Ltd. supplied 150 sets of P50 Insulated Fishplates and 450 sets of P50 standard Fishplates to the Wuhan Rail Transit Line 12 Wuchang section project, conforming to the TB/T2345-2008 standard.

 

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Blog