60kg Type II Rail Clip Fastening System and 60kg Ballastless Rail Fastening System
In 2017, Anyang Railway Equipment Co., Ltd. provided 53,108 sets of 60kg Type II rail clip fastening system and 60kg ballastless transition section auxiliary rail fastening system to the Jiqing high-speed railway.
The Jinan-Qingdao High-speed Railway is a high-speed railway connecting Jinan and Qingdao in Shandong Province, China. The construction of the Jinan-Qingdao high-speed railway started on August 11, 2015; The track laying was completed on the whole line on December 30, 2017; it was completed and put into operation on December 26, 2018.
As of January 10, 2019, the Jinan-Qingdao high-speed railway starts from Jinan East Station in the west and ends at Hongdao Station in the east, with a total length of 307.9 km and a total of 11 stations. The initial operating speed is 300 km/h; the design speed of the Jiaozhou North-Hongdao section is 250 km/h, and the train operating speed is 250 km/h.
The 500-meter long rail used in the Jinan-Qingdao high-speed railway has a weight of 60 kg/m and the weight of a single rail reaches 30 tons. When laying each long rail of more than 500 m, a tractor needs to be pulled in front, the long rail car is pushed, and the distance between the two rails is fixed by the rungs.
In 2017, Anyang Railway Equipment Co., Ltd. provided 53,108 sets of 60kg Type II rail clip fastening system (according to the special line 3351) and 60kg ballastless transition section auxiliary rail fastening system (according to 0607 along the line) to the Jiqing high-speed railway.