Home » Blog » P50 and P60 rail joint splice bars and high-strength frozen joint splice bars for Nanjing Metro Line S3

P50 and P60 rail joint splice bars and high-strength frozen joint splice bars for Nanjing Metro Line S3

In 2016, Anyang Railway Equipment Co., Ltd(AT) provided P50 and P60 rail joint splice bars (including railway track bolts, nuts and washers), and high-strength frozen joint splice bars (including railway track bolts, nuts and washers) for the first phase project of Nanjing Metro Line S3 ).

Rated 4.8/5 based on 435 customer reviews
Share:
Content

Nanjing Metro Line S3, also known as Ninghe Intercity Rail Transit, is a rapid rail transit connecting Nanjing City, Jiangsu Province and He County, Anhui Province. The first phase of the project is all within the city of Nanjing, the total length of the first phase of the project is 36.22 km.

In 2016, Anyang Railway Equipment Co., Ltd(AT) provided P50 and P60 rail joint splice bars (including railway track bolts, nuts and washers), and high-strength frozen joint splice bars (including railway track bolts, nuts and washers) for the first phase project of Nanjing Metro Line S3 ). The railway rail fishplates were made in accordance with the relevant standards of TB/T2345-08 “Technical Specifications for the Procurement of 43kg/m~75kg/m as Joint Bar”. Fishbolts were made in accordance with the relevant standards of TB/T2347-08 “High-strength rail joint bolts and nuts”.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit