Home » Blog » Various Railway Rail Fastening Products(Fastening Systems) for Guiyang Rail Transit Line 3

Various Railway Rail Fastening Products(Fastening Systems) for Guiyang Rail Transit Line 3

In December 2021, Anyang Railway Equipment Co., Ltd. provided various railway rail fastening products(DT-Ⅲ Rail Fastening System, DT-Ⅲ Low Resistance Rail Fastening System, DJK5-1 Rail Fastening System, Type-I Rail Fastening System, WJ-2A Rail Fastening System) to the first phase of Guiyang Rail Transit Line 3.

Rated 5/5 based on 536 customer reviews
Share:
Content

Guiyang Rail Transit Line 3 is a subway line under construction in Guiyang, and its logo color is red. The first phase of the project has a total length of 43.03 km, including 41.672 km of underground lines, 0.710 km of elevated lines, and 0.648 kilometers of transitional sections. There are 29 stations and 28 sections in total, with 1 vehicle depot, 1 parking lot, 3 main substations and 1 Operation Control Center. The estimated total investment of the project is 32.231 billion YUAN, and the construction period is 5 years. The vehicle is a B-type car with a maximum running speed of 100 km/h. The initial, near and long-term use of 6 marshalling. The estimated total investment of the project is 32.231 billion YUAN, and the construction period is 5 years.

After the completion of Guiyang Rail Transit Line 3, it will connect Xintian, the old city and the Huaxi group, and connect with the East Railway Station to realize seamless transfer between Line 3, the municipal express railway and the Changkun passenger high-speed railway. Guiyang City plans urban transportation and passenger transportation within the central urban area, taking into account the dual functions of guiding and promoting urban development and solving the contradiction between transportation supply and demand.

In December 2021, Anyang Railway Equipment Co., Ltd. signed a contract with China Railway Material Group Kunming Co., Ltd. to provide the following railway rail fastening products to the first phase of Guiyang Rail Transit Line 3, with a total contract value of 46.5 million YUAN.

Type Unit Quantity
DT-Ⅲ Rail Fastening System set 313074
DT-Ⅲ Low Resistance Rail Fastening System set 5605
DJK5-1 Rail Fastening System set 29100
Type-I Rail Fastening System (for 50kg/m rail) set 33329
Type-I Rail Fastening System (for 60kg/m rail) set 4317
WJ-2A Rail Fastening System set 451
Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit