Type-I Clip Fastening System for Maintenance Train Depot
In 2021, Anyang Railway Equipment Co., Ltd supplied 3080 sets of Type-I clip fastening system used for 50kg/m rails to the new Harbin to Mudanjiang Wangzhaotun power supply and maintenance train depot project.
The newly built rail garage of Harbin Industrial Electric Power Supply and Maintenance Vehicle Train Storage Project, with a total construction area of 4384.71m2, is a concrete frame structure and an independent foundation under the column. After the reconstruction, the length of Wangzhaotun Station Platform is 30.42m, the width of which is 4.7m, the construction area is 142.974 m2. The construction area of the newly built driver’s shift room and material room is 230.81 m2. In the track project, 602m of lines will be demolished, 990m of new lines will be laid, and two sets of single-opening No. 9 turnouts will be inserted to connect to the new track garage and platform. The overall construction period is 14 months. After the completion of the project, it will further enhance the construction of railway infrastructure and facilitate the development of transportation and production.
In 2021, Anyang Railway Equipment Co., Ltd supplied 3080 sets of Type-I clip fastening system used for 50kg/m rails to the new Harbin to Mudanjiang Wangzhaotun power supply and maintenance train depot project, implemented of TB T/1495 standard.