Home » Blog » I-type Divided Rail Fastener Assembly for Shenzhen Metro Line 6

I-type Divided Rail Fastener Assembly for Shenzhen Metro Line 6

In 2019, Anyang Railway Equipment Co., Ltd. provided 21,334 sets of I-type divided rail fastener assembly(railway fastening system) to Shenzhen Metro Line 6.

Rated 5/5 based on 531 customer reviews
Share:
Content

Shenzhen locates in Guangdong Province, China, is a super-large city in China, a special economic zone in China, a national economic center city, and an international city. Shenzhen is one of the four central cities in the Guangdong-Hong Kong-Macao Greater Bay Area, a national logistics hub, an international comprehensive transportation hub, one of China’s three national financial centers, and a global ocean center city. Shenzhen is known as the “Silicon Valley of China”.

The Shenzhen Metro refers to the urban rail transit serving Shenzhen City, Guangdong Province, China. Its first line was officially opened for operation on December 28, 2004, making Shenzhen the 8th city in mainland China with rail transit.

Shenzhen Metro Line 6 is a subway line in Shenzhen, Guangdong Province, China. It was opened for operation on August 18, 2020.

As of January 2021, the total length of Shenzhen Metro Line 6 is 49.35 km and a total of 27 stations, including 12 underground stations and 15 elevated stations, with a design speed of 100 km/h.

In 2019, Anyang Railway Equipment Co., Ltd. provided 21,334 sets of I-type divided rail fastener assembly to Shenzhen Metro Line 6 (each set of rail fastener assembly includes 2 pcs of T-bolts, 2 pcs of lock nuts, and 2 pcs of B-type rail elastic clips, 1 pcs of iron plate, 1 pcs of iron rubber plate under iron plate, 2 pcs of insulating gauge blocks, 2 pcs of anchor bolts, 2 pcs of double-coil spring washers, 2 pcs of plastic sleeves).

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit