Damping Joint Bars, Regular Joint Bars for Guangzhou Metro Line 11
In 2021, Anyang Railway Equipment Co., Ltd. provided Guangzhou Metro Line 11 with 950 sets of damping joint bars for 50kg/m rail, 40 sets of damping joint bars for 60kg/m rail, and 60 sets of regular joint bars for 50kg /m rail and 1036 sets of regular joint bars for 60kg/m rail.
Guangzhou Metro Line 11 is one of the urban rail transit lines under construction by Guangzhou Metro. It is expected to open for operation at the end of 2022-2023.
Guangzhou Metro Line 11 has a total length of 43.2 kilometers, all of which are underground lines. There are 32 underground stations, 20 of which are transfer stations, of which one station (urban rail Pazhou station) is built on behalf of them; Chisha depot 1 is set up. The train adopts 8-car group A-type train, which is produced by CRRC ZELC and adopts GOA4-level unmanned mode. As of the end of January 2022, 73% of the civil works of Line 11 have been completed. Among of the 32 stations, 2 have been opened and 13 have been capped.
In 2021, Anyang Railway Equipment Co., Ltd. provided Guangzhou Metro Line 11 with 950 sets of damping joint bars for 50kg/m rail, 40 sets of damping joint bars for 60kg/m rail, and 60 sets of regular joint bars for 50kg /m rail and 1036 sets of regular joint bars for 60kg/m rail.