Home » Blog » Guard Rail Fastener Systems and Rail Spindles for Yongxin Railway Special Line

Guard Rail Fastener Systems and Rail Spindles for Yongxin Railway Special Line

In 2021, Anyang Railway Equipment Co., Ltd. provided 16,128 sets of guard rail fastener systems and 41 sets of rail spindles to the Yongxin Railway Special Line.

Rated 4.8/5 based on 433 customer reviews
Share:
Content

The Yongxin railway special line is a national railway class II single-track electrified heavy-haul railway. The total investment of the project is 2.3 billion YUAN. It was invested and constructed by Yongxin Group and started in August 2018. The total length of the special line is 27.7 km (including the decoupling line), which leads from the west end of Anze Station of the Washi Railway in Anze County, and ends at Tangcheng Station, Tangcheng Industrial Park, Anze Economic and Technological Development Zone. The operating length of Tangcheng Station and the loading and unloading line is 4.2 km. The annual coke sending capacity is 6.5 million tons in the near future, 10 million tons in the long-term (including 2 million tons of coal sending capacity), and the annual coal unloading capacity at the station is 200 million tons. tons. It can meet the loading and unloading transportation conditions of 10,000-ton trains. The Yongxin special railway line is currently the largest heavy-haul railway special line in Shanxi Province, and will become an important channel for coal transportation in the east of the Huodong mining area in the future.

In 2021, Anyang Railway Equipment Co., Ltd. provided 16,128 sets of guard rail fastener systems (including gussets, joint gussets, screw spikes, nuts, double spring washers, flat washers, rubber pads) and 41 sets of rail spindles, etc. to the Yongxin Railway Special Line.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Conventional Railway