Home » Blog » Railway rail fastening materials(joint splints, washers and nuts) for Wuxi Metro Line 2

Railway rail fastening materials(joint splints, washers and nuts) for Wuxi Metro Line 2

In 2014, Anyang Railway Equipment Co., Ltd(AT) provided 60kg/m railway rail fastening material (including frozen joint splints, high-strength washers, M27 high-strength nuts, M27*160 high-strength bolts) to Wuxi Metro Line 2.

Rated 4.9/5 based on 278 customer reviews
Share:
Content

Wuxi Metro Line 2 is the second subway line opened in Wuxi City, Jiangsu Province, China. It opened for trial operation on December 28, 2014 (Meiyuan Kaiyuan Temple Station to Wuxi East Station), which is the east-west main line of rail transit in the main urban area of Wuxi. As of February 2021, the total length of Wuxi Metro Line 2 is 26.3 km.

In 2014, Anyang Railway Equipment Co., Ltd(AT) provided 60kg/m railway rail fastening material (including frozen joint splints, high-strength washers, M27 high-strength nuts, M27*160 high-strength bolts) to Wuxi Metro Line 2. The railway fishplates were made in accordance with the relevant standards of TB/T2345-08 “Technical Specifications for the Procurement of 43kg/m~75kg/m as Joint Bar”. Fishbolts were made in accordance with the relevant standards of TB/T2347-08 “High-strength rail joint bolts and nuts”.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit