Home » Blog » Type II Rail Fastening System for Nanjing-Hangzhou Railway

Type II Rail Fastening System for Nanjing-Hangzhou Railway

In 2019, Anyang Railway Equipment Co., Ltd. provided new type II rail fastening system for the replacement and renovation project of 3 and 8 wide sleepers at Huzhou Station of Nanjing-Hangzhou High-speed Railway.

Rated 4.9/5 based on 519 customer reviews
Share:
Content

Nanjing-Hangzhou High-speed Railway (Nanjing-Hangzhou High-speed Railway), referred to as Nanjing-Hangzhou High-speed Railway, also known as Nanjing-Hangzhou Passenger Dedicated Line, is a high-speed railway connecting Nanjing City in Jiangsu Province and Hangzhou City in Zhejiang Province. It is an important part of the “Yangtze River Delta” intercity passenger transportation system.

The Nanjing-Hangzhou high-speed railway line (also known as the Nanjing-Hangzhou high-speed railway and the Nanjing-Hangzhou passenger dedicated line) starts from Nanjing in the north and ends in Hangzhou in the south, with a total length of 248.963km.

Huzhou Railway Station is located in Huzhou City, Zhejiang Province, China. It is a first-class station under the jurisdiction of China Railway Shanghai Bureau Group Co., Ltd. and an intermediate station between Nanjing-Hangzhou High-speed Railway and He-hang High-speed Railway.

Huzhou Railway Station is divided into the high-speed field and general speed field. In 2019, Anyang Railway Equipment Co., Ltd. provided new type II rail fastening system for the replacement and renovation project of 3 and 8 wide sleepers at Huzhou Station of Nanjing-Hangzhou High-speed Railway. After the reconstruction of Huzhou Station, the shape of Pusu Station has not changed, only 14 station lines have been displaced, and the signal interlocking relationship has not changed. Add 2 Shanghe-Hangzhou main lines (Route Ⅱ and IX) and 2 Shanghai-Suhu main lines (Route 1 and 10) to the high-speed yard, remove 3 sets of turnouts in the existing high-speed yard, 2 sets of turnouts in the maintenance area, and insert paving 3 sets of new turnouts, 6 sets of 42# turnouts in Xinpu, 10 sets of 18# turnouts, 1 set of 12# turnouts, 1.57km line in the new maintenance work area and 5 sets of P50-9# turnouts.

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More High Speed Railway