Home » Blog » Type I, II, III Rail Fastening System for Wuhu-Guangde Railway

Type I, II, III Rail Fastening System for Wuhu-Guangde Railway

In 2016, Anyang Railway Equipment Co., Ltd. provided 50kg I-type rail fastener system (according to TB/T 1495 standard), 60kg II-type rail fastener system (according to special line 3351), 60kg III-type rail fastener system for the electrification reconstruction project of Wuhu-Guangde Railway (according to the dedicated line (01) 3328).

Rated 4.6/5 based on 408 customer reviews
Share:
Content

The Wuhu-Guangde Railway Electrification Project is located in the central and eastern part of Anhui Province, with a total length of 146 km, passing through Wuhu and Xuancheng. Main project content: The existing 146km Wuhu-Guangde railway has been electrified, and the effective length of the arrival and departure lines of Wuhu South, Wan Site, Xiangkou Bridge, Jianguo, Shishipu, Oujiedu, and Guangde stations has been extended to 1050m; Close Taoxin, Taoxin Town, and Sanyuan Station; simultaneously implement projects such as leveling and erecting the entire line and closing the line. The project started in December 2015 and was completed and put into operation in December 2018.

The Wuhu-Guangde railway electrification renovation project is a national railway class I, double-track, with a maximum gradient of 6‰, the minimum curve radius remains the current state, and the effective length of the station-to-departure line is 1050m. Diesel locomotives are replaced by electric locomotives for traction.

In 2016, Anyang Railway Equipment Co., Ltd. provided 50kg I-type rail fastener system (according to TB/T 1495 standard), 60kg II-type rail fastener system (according to special line 3351), 60kg III-type rail fastener system for the electrification reconstruction project of Wuhu-Guangde Railway (according to the dedicated line (01) 3328).

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Conventional Railway