Home » Blog » Insulated Joint Bars, Fishbolts and Insulators Manufacturer for Upgrade and Reconstruction Project

Insulated Joint Bars, Fishbolts and Insulators Manufacturer for Upgrade and Reconstruction Project

In 2024, Anyang Railway Equipment Co., Ltd. provided insulated joint bars, insulated fishbolts and Insulators to the large-scale arrival and departure line upgrade and reconstruction project

Rated 4.6/5 based on 215 customer reviews
Share:
Content

The upgrading and reconstruction project of the arrival and departure line of the main line includes (1) track engineering (rail replacement, sleeper replacement, switch replacement, etc.), and (2) signal supporting related projects. The contracting scope of this project is: involving Yanzhuang Station, Shuidigou Station, Shijiugou Station, Danzhouying Station, Jiusumu Station, Ganfangyao Station, Dahongcheng Station, Laoniuwan Station, Longwangqu Station, Tang 10 construction sites including the public tower station, including the replacement of 50kg/m steel rails with 60kg/m rails on the arrival and departure line, the replacement of type II concrete sleepers with type III concrete sleepers, and the replacement of 50kg/m steel track switches with 60kg/m steel track switches. Signal supporting related projects. The contract period is from April 1, 2024 to June 30, 2025

In 2024, Anyang Railway Equipment Co., Ltd. provided 536 pieces of 60Kg/m rail insulated joint bars (fishplates), 1,608 sets of M24×170 sets of insulated fishbolts, and 268 sets of Insulators for 60Kg/m rail to the large-scale arrival and departure line upgrade and reconstruction project rail insulation (including 1 insulated rail end, 4 groove insulation, and insulating tubes and insulating flat pads.)

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Blog