Railway Brdige Steel Railing Columns, Brdige Handrails Manufacturer for Xishi High-speed Railway
In 2024, Anyang Railway Equipment Co., Ltd. provided bridge steel railing columns, bridge handrails, sound barrier steel columns and supporting steel structure parts to the Xishi High-speed Railway.
The Xishi High-speed Railway starts from Xi’an, Shaanxi Province in the west, crosses the Qinling Mountains to the southeast, passes through Shangluo, and ends in Shiyan, Hubei Province. It is an important part of the Wuhan-Xi’an section of the Fuzhou-Yinchuan High-speed Railway.
The length of the main line of the Xishi High-speed Railway is 256.7 km with a designed speed of 350 km/h. It passes through Xi’an, Shangluo, Shaanxi Province and Shiyan, Hubei Province, and connects to the completed Hanshi High-speed Railway. The length of Hubei section is 86.36 km and has two stations, Shiyan East and Yunxi. Yunxi Station is a newly built station.
After the completion and opening of the Xishi High-speed Railway, Xi’an to Shiyan will be able to arrive within 1 hour, and the train running time from Wuhan to Xi’an is expected to be shortened to about 2.5 hours.
In 2024, Anyang Railway Equipment Co., Ltd. provided bridge steel railing columns, bridge handrails, sound barrier steel columns and supporting steel structure parts to the Xishi High-speed Railway.