Home » Blog » Type-III Track Fastening System and Turnouts Fastening System for Wuhan Metro Line 7

Type-III Track Fastening System and Turnouts Fastening System for Wuhan Metro Line 7

From 2021 to 2022, Anyang Railway Equipment will provide Wuhan Metro Line 7 with 3,000 sets of type-III track fastening systems and 1,470 sets of fastening systems for turnouts.

Rated 4.8/5 based on 270 customer reviews
Share:
Content

Wuhan Metro Line 7 is the 8th completed and operated subway line in Wuhan City, Hubei Province, China, and the 4th subway line in Wuhan City that crosses the Yangtze River. The first phase of operation was opened on October 1, 2018. project.

From 2021 to 2022, Anyang Railway Equipment will provide Wuhan Metro Line 7 with 3,000 sets of type-III track fastening systems and 1,470 sets of the fastening systems for turnouts, including the following products:

Type No. Product Specification Quantity
type-III track fastening system 1 Iron pad   1
2 Adjustable gusset   2
3 Rail clip Type-III 2
4 Anchor bolt 30*150 2
5 Flat washer 30 2
6 Heavy duty spring washer 30 2
 Fastening system for 60kg/m turnout 1 Iron pad 429*170*20 1
2 Rail clip A/B 2
3  Spring washer M30 2
4  T-bolts M22*60 2
5 nut M22 2
6 Screw spike 30*155 2
7 Flat washer M23 2
8 Rubber pad I Under rail 1
9 Rubber pad II Under pad 2
10 Insulating gauge block 8#/10# 2

 

Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Urban Rail Transit