Cast Iron Tie Plates, Rail Fishplates, Rail Bolts, Frozen Joint Bars for Nanjinig Ninghe Intercity Line
Anyang Railway Equipment Co., Ltd provided Type I Cast Iron Tie Plate for WJ-2A Rail Fastening System, Type II Cast Iron Tie Plate for WJ-2A Rail Fastening System, Type I Flat Cast Steel Plate for WJ-2A Rail Fastening System, Type II Flat Cast Iron Tie Plate for WJ-2A Rail Fastening System, Regular Rail Fishplates with joint rail bolts, nuts and washers for P50 and P60 steel rails as well as high-strength frozen rail joint bars with joint rail bolts, nuts and washers for Nanjinig Ninghe Intercity Line.
The Nanjing Metro is an urban rail transit serving Nanjing, China, and various areas of the Nanjing Metropolitan Area. Its first subway line opened on May 15, 2005.
Till December 2020, Nanjing Metro has opened a total of 10 operating lines, including lines 1, 2, 3, 4, 10, S1, S3, S7, S8, and S9, all of which use the subway system, with a total of 174 stations. The total length of the Metro line of Nanjing is 378 km and the total length of the line ranks 6th in China (after Shanghai, Beijing, Guangzhou, Chengdu, and Shenzhen), covering 11 municipal districts of Nanjing. Nanjing became China’s first city will all districts and counties to cover subways.
Anyang Railway Equipment Co., Ltd provided Type I Cast Iron Tie Plate for WJ-2A Rail Fastening System, Type II Cast Iron Tie Plate for WJ-2A Rail Fastening System, Type I Flat Cast Steel Plate for WJ-2A Rail Fastening System, Type II Flat Cast Iron Tie Plate for WJ-2A Rail Fastening System, Regular Rail Fishplates with joint rail bolts, nuts and washers for P50 and P60 steel rails as well as high-strength frozen rail joint bars with joint rail bolts, nuts and washers for Nanjinig Ninghe Intercity Line. The material for tie plates are QT450-10. The length of the first phase of the Nanjinig Ninghe Intercity Line is 36.22 km, with 19 stations and a maximum speed of 100 km/h.