Fishplates, Fishbolts, Fastening Systems Supplier for Jiangnao Railway
In 2025, Anyang Railway Equipment Co., Ltd. supplied fishplates, high-strength bolts, and Type I Fastening System and Type II Fastening System to the Jiangnao Railway’s second extension project.
The Zhundong Jiangjunmiao to Hami Naomaohu (Baishi Lake South) railway reconstruction and second line project is located in Hami City and Changji Hui Autonomous Prefecture in northeastern Xinjiang Uygur Autonomous Region. The total length of the reconstructed line is 392.414 km, including 266.797 km within Hami City and 125.617 km within Changji Hui Autonomous Prefecture. The construction scope of the track section 2-2 of the Jiangnao Railway’s second extension project, undertaken by China Communications Construction Second Highway Engineering Group, extends from K384+400 to K665+383. This includes the construction of 280.983 km of mainline track and the renovation of eight stations: Nantaizi, Chahaquan, Santanghu, Tiaohu, Wangyangtai, Hanshuiquan, Kumusu, and Haktorangge.
In 2025, Anyang Railway Equipment Co., Ltd. supplied fishplates, high-strength bolts, and Type I Fastening System and Type II Fastening System to the Jiangnao Railway’s second extension project.
S/N | Product | Type | Unit | Qty |
1 | Fishplate | 60kg/m | Set | 200 |
2 | Fishplate | 50kg/m | Set | 650 |
3 | High-strength Bolt | 24*145,10.9 | Set | 1104 |
4 | Fastening System | Type II | Set | 10000 |
5 | Fastening System | Type I | Set | 12000 |