The video shows the construction technology of I-type Double Block Ballastless Track.
The video shows the 500-meter-long rails laying process for Hanshi High-Speed Railway.
The video introduces the process for the double block ballastless track construction. 1. construction preparation. 2. Construction and assembly. 3. Welding. 4. Install the rail bed. 5. Partial emergency repair.
The video shows the construction characteristics of subway shield method. 1. Little impact on the surrounding environment. 2. High construction precision requirements. 3. Classification of the subway shield method.
The video shows the new subway slab ballastells track technology, which solved the geometric dimensions of the track slab in the narrow space of the subway, slab structure etc relevant technical difficulties during construction.
The video introduces the key technology of ballasted track seamless track construction.
In 2022, Anyang Railway Equipment Co., Ltd. has been providing embedded U-bolts, ballast steel plates, tie plates, etc for the capacity expansion and reconstruction project of the Emei-Miyi section of the Chengdu-Kunming Railway.
In 2022, Anyang Railway Equipment Co., Ltd. has been providing emergency clamps for P60 rail, P50 rail joints, P60 rail joints, insulated gauge rods and other railway accessories to Lunan high-speed railway.
High-Quality Type I Rail Clip for Railroad Track Fasteners has good elasticity and small pressure loss, and can maintain the geometric position of the crawler well. It has become the main clip fasteners of China’s concrete sleeper production line.