In 2025, Anyang Railway Equipment Co., Ltd. supplied 232.96 tons of 8.8 grade M30 Tunnel segment bolts to the Wuxi Metro Line 6 Section 07 project.
In 2025, Anyang Railway Equipment Co., Ltd. supplied 53,200 sets of M30*545 tunnel segment bolts to Wuhan Metro Line 12.
The video introduces how to construct the steel spring floating slab monolithic track bed and resonant composite track bed.
In 2022, Anyang Railway Equipment Co., Ltd. will supply 73556 sets of segment tunnel bolts M30 to Wuchang Section of Wuhan Rail Transit Line 12.
The tunnel bolt production line in Anyang Railway Equipment Co., Ltd(AT) is composed of all-solid-state IGBT heating equipment to heat the workpiece and automatic special thread rolling machine, the maximum output is 15,000 Pcs/day.
The tunnel bolt production line is composed of all-solid-state IGBT heating equipment to heat the workpiece and automatic special thread rolling machine, the maximum output is 15,000 Pcs/day.
The tunnel bolt production line in Anyang Railway Equipment Co. Ltd (AT) is composed of all-solid-state IGBT heating equipment to heat the workpiece and automatic special thread rolling machine, the maximum output is 15,000 Pcs/day.
Application: Segment connection Concrete tube connection Tunnel Reinforce fastening. Metro Tunnel Segment Connection. Sewage Water Tunnel segment
Concrete tube connection Tunnel Reinforce fastening. Metro Tunnel Segment Connection. Sewage Water Tunnel segment