Anyang Railway Equipment Co., Ltd(AT) supplied 59,752 curved tunnel connecting bolts to the east extension of Shenzhen Metro Line 7 in 2022, with M27 arc length 545mm and R360mm.The surface of the segment
In 2022, Anyang Railway Equipment Co., Ltd provided 70,532 sets of tunnel segment bolts to Changsha Metro Line 2.
In 2022, Anyang Railway Equipment Co., Ltd. will supply 73556 sets of segment tunnel bolts M30 to Wuchang Section of Wuhan Rail Transit Line 12.
The tunnel bolt production line in Anyang Railway Equipment Co., Ltd(AT) is composed of all-solid-state IGBT heating equipment to heat the workpiece and automatic special thread rolling machine, the maximum output is 15,000 Pcs/day.
The tunnel bolt production line is composed of all-solid-state IGBT heating equipment to heat the workpiece and automatic special thread rolling machine, the maximum output is 15,000 Pcs/day.
Application: Segment connection Concrete tube connection Tunnel Reinforce fastening. Metro Tunnel Segment Connection. Sewage Water Tunnel segment