Railroad Rail Fasteners for Wuhan Metro Line 8
Jun 04, 2021
Anyang Railway Equipment Co., Ltd(AT) provided Single toe elastic clips rail fastening systems with steel tie plates and gauge buckles etc for Wuhan Metro Line 8.
Wuhan is the capital of Hubei Province, a central city in central China, and an important industrial base in China.
Wuhan Metro is an urban rail transit serving Wuhan City, Hubei Province, China. Its first line-Wuhan Metro Line 1 (formerly known as Wuhan Light Rail Line 1) was officially opened on July 28, 2004 and September 28 Entering the formal operation stage, Wuhan has become the seventh city in mainland China to open rail transit.
Wuhan Metro Line 8 is the 7th completed and operated subway line in Wuhan, Hubei Province, China, and the 3rd subway line in Wuhan that crosses the Yangtze River. Construction started on October 26, 2014. The first phase of the project (Jintan Road Station to Liyuan Station) was opened on December 26, 2017, and the third phase of the project (Yezhi Lake Station to Junyun Village Station) was opened and operated on November 6, 2019. On January 2, 2019, the second phase of the project (Liyuan Station to Yezhihu Station) was opened.
As of January 2, 2021, Wuhan Metro Line 8 has a total length of 39 km, all of which are underground lines; a total of 26 stations, all of which are underground stations; Wuhan Metro Line 8 trains use 6-car type A trains.
Wuhan is the capital of Hubei Province, a central city in central China, and an important industrial base in China.
Wuhan Metro is an urban rail transit serving Wuhan City, Hubei Province, China. Its first line-Wuhan Metro Line 1 (formerly known as Wuhan Light Rail Line 1) was officially opened on July 28, 2004 and September 28 Entering the formal operation stage, Wuhan has become the seventh city in mainland China to open rail transit.
Wuhan Metro Line 8 is the 7th completed and operated subway line in Wuhan, Hubei Province, China, and the 3rd subway line in Wuhan that crosses the Yangtze River. Construction started on October 26, 2014. The first phase of the project (Jintan Road Station to Liyuan Station) was opened on December 26, 2017, and the third phase of the project (Yezhi Lake Station to Junyun Village Station) was opened and operated on November 6, 2019. On January 2, 2019, the second phase of the project (Liyuan Station to Yezhihu Station) was opened.
As of January 2, 2021, Wuhan Metro Line 8 has a total length of 39 km, all of which are underground lines; a total of 26 stations, all of which are underground stations; Wuhan Metro Line 8 trains use 6-car type A trains.