507,558 Sets of Various Railway Fastening Systems Supplier for Shanghai-Chongqing-Chongqing high-speed railway Nanjing hub and Paihe logistics base
Aug 05, 2023
In 20023, Anyang Railway Equipment Co., Ltd(AT) supplied a total of 507,558 sets of 50kg Type-I Fastening System, 60kg Type-II Fastening System, 60kg Type-I Fastening System (higher adjustment) and 60kg small resistance type Fastening System to the newly-built Shanghai-Chongqing-Chongqing high-speed railway Nanjing hub and Paihe logistics base.
The new Shanghai-Nanjing-Hefei high-speed railway starts from the new Shanghai Baoshan Station at the Shanghai hub and ends at the Hefei South Station at the Hefei hub. The ratio is 95.68%. There are a total of 16 stations along the line, of which 10 are newly built.
The new Shanghai-Nanjing-Hefei high-speed railway starts from the new Shanghai Baoshan Station at the Shanghai hub and ends at the Hefei South Station at the Hefei hub. The ratio is 95.68%. There are a total of 16 stations along the line, of which 10 are newly built.
Project | Type | Standard/Drawing | Unit | Qty |
newly-built Shanghai-Chongqing-Chongqing high-speed railway Nanjing hub | 60kg Type-II Fastening System(Coastal, tunnel or areas with severe acid rain corrosion) | Special Line 3351 TB/T3065-2020 | Set | 325804 |
newly-built Shanghai-Chongqing-Chongqing high-speed railway Nanjing hub | 50kg Type-I Fastening System(Coastal, tunnel or areas with severe acid rain corrosion) | TB/T1495-2020 | Set | 129356 |
newly-built Shanghai-Chongqing-Chongqing high-speed railway Nanjing hub | 60kg Type-II Fastening System(height-adjustment) | TB/T1495-2020 | Set | 232 |
newly-built Shanghai-Chongqing-Chongqing high-speed railway Nanjing hub | 60kg small resistance type Fastening System | Research Line 9204 | Set | 23530 |
Paihe logistics base | 60kg Type-II Fastening System(general area) | Research Line 3351 TB/T3065-2020 | Set | 28636 |
Total | - | - | - | 507558 |