197,792 sets of Type I and Type II fastening systems supplier for Chengdu-Kunming Railway etc projects
Dec 27, 2023
In 2023, Anyang Railway Equipment Co., Ltd(AT) Provided 197,792 sets of Type I and Type II fastening systems for the projects: expanded the capacity of the Yongren to Guangtong section of the Chengdu-Kunming Railway, newly-built the Wenling to Yuhuan section of the Hangzhou via Shaoxing to Taizhou railway, newly-built the Huaibei to Suzhou to Bengbu intercity railway, and newly-built the Chongqing to Wanzhou Expressway, the reconstruction project of the Railway and Wuhan Hub Hankou Bus Technical Maintenance Institute Renovation Project. Type I and Type II fastening systems are used in general areas and coastal areas, tunnels or areas with severe acid rain corrosion.
Project | Product | Specification | Drawing | Unit | Qty | Place of Delivery |
Wenling to Yuhuan section | Fastening systems for conventional railway | 60kg/m type II (coastal, tunnel or areas with severe acid rain corrosion) | Dedicated line 3351 TB/T 3065-2020 | Set | 3014 | Yuhuan section construction site |
Wenling to Yuhuan section | Fastening systems for conventional railway | 50kg/m type I (coastal, tunnel or areas with severe acid rain corrosion) | TB/T 1495-2020 | Set | 732 | Yuhuan section construction site |
Huaisu-Beng Railway | Fastening systems for conventional railway | 50kg/m type I(general areas) | TB/T 1495-2020 | Set | 26972 | Newly built Huaisu-Beng railway station in Anhui Province |
Huaisu-Beng Railway | Fastening systems for conventional railway | 60kg/m type II(general areas) | Dedicated line 3351 TB/T 3065-2020 | Set | 33202 | Newly built Huaisu-Beng railway station in Anhui Province |
Wuhan Hub Renovation Project | Fastening systems for conventional railway | 50kg/m type I (coastal, tunnel or areas with severe acid rain corrosion) | TB/T 1495-2020 | Set | 586 | Hankou Bus Maintenance Center |
Yongguang Railway | Fastening systems for conventional railway | 50kg/m type I (coastal, tunnel or areas with severe acid rain corrosion) | TB/T 1495-2020 | Set | 35360 | Guangtong Station |
Yongguang Railway | Fastening systems for conventional railway | 60kg/m type II (coastal, tunnel or areas with severe acid rain corrosion) | Dedicated line 3351 TB/T 3065-2020 | Set | 5294 | Guangtong Station |
Chongqing-Wanzhou High-speed Railway | Fastening systems for conventional railway | 50kg/m type I(general areas) | TB/T 1495-2020 | Set | 18352 | Construction sites along the 6th bidding section in front of Yuwan High-speed Railway Station |
Chongqing-Wanzhou High-speed Railway | Fastening systems for conventional railway | 60kg/m type II(general areas) | Dedicated line 3351 TB/T 3065-2020 | Set | 74280 | Construction sites along the 6th bidding section in front of Yuwan High-speed Railway Station |