FAQ
Projects
Location:
Home > Projects > Classic Case

I,447,320 sets Rail Fastening System for Heruo Railway

Mar 03, 2022
Hetian-Ruoqiang Railway is a National Railway Class I railway connecting Hotan City and Ruoqiang County in Xinjiang Uygur Autonomous Region, China. The east extension project is a convenient transportation channel for the southern Xinjiang region to communicate with the northwest and southwest regions.
The length of Heruo railway line is 825.476 km and the design speed is120 km/h, the Heruo Railway officially started construction on December 20, 2018, and the entire line was laid and completed on September 27, 2021. It is expected to open for operation in June 2022.
During 2019-2021 year, Anyang Railway Equipment Co., Ltd. Supplied Heruo Railway with 151,473 sets of I-type general-speed railway fastening assembly (used for 50kg/m rail, TBT/T1495 standard) and 1,295,847 sets of II-type general-speed railway fastening assembly (used for 60kg, according to special line 3351, TBT/T 3065 standard).
China Made TypeI, II Rail Fastening System for Heruo Railway - Anyang Railway Equipment China Supplier TypeI, II Rail Fastener System for Heruo Railway - Anyang Railway Equipment
China Manufacturer TypeI, II Track Fastener System for Heruo Railway - Anyang Railway Equipment China Factory TypeI, II Track Fastening System for Heruo Railway - Anyang Railway Equipment

 
Share: