FAQ
Projects
Location:
Home > Projects > Classic Case

Rail Fastening System for New Ge’ermu-Korla Railway Project

May 19, 2021
In 2017, Anyang Railway Equipment Co., Ltd(AT) provided fastening system for New Harbin-Jiamusi Railway Project, the goods included Railway Fastening Systems with I-type rail clips for 50kg steel rails, Railway Fastening Systems with II-type rail clips for 60kg steel rails, Adjustable Fastening Systems with Tie plate standard as per TB/T1495. 

Harbin-Jiamusi Rapid Railway, referred to as Harbin-Jiamusi Rapid Railway, is a national railway I-level double-track express railway from Harbin City, Heilongjiang Province, China to Jiamusi City. The construction project is also the longest high-speed railway in the alpine region of China.
The Hajia Express Railway officially started construction on July 9, 2014; the joint commissioning and testing began on May 1, 2018; The entire line was officially opened to traffic on September 30, 2018.
As of September 2018, the Hajia Express Railway runs from Harbin Station to Jiamusi Station, with a total length of 343 kilometers, 19 stations, a design speed of 200 kilometers per hour, and a train operating speed of 200 km/h.
On September 30, 2020, the Hajia (Harbin to Jiamusi) railway, the longest high-speed railway in the alpine region of China, was opened for the second anniversary of its operation.

railway fastening-system for Geermu-Korla Railway Supplier- Anyang Railway Equipment
Rail Fastening System for Ge’ermu-Korla Railway Supplier Rail Fastening System for Ge’ermu-Korla Railway Supplier
Share:
Related Products